← Country index

West Africa

Sierra Leone

EU Compliance · Geopolitical Risk · Sourcing Attractiveness

EU Compliance

lower score = lower risk

5.2

Geopolitical Risk

lower score = lower risk

2.8

Sourcing Attractiveness

higher score = more attractive

3.5

Why these scores

EU Compliance, by dimension

Forced & child labour5
Worker rights & FOA5
OHS & audit transparency5
Food & product safety5
Environmental & regulatory5
Governance & anti-corruption8
Tariff & preferential access2
Non-tariff barriers5
Supply chain traceability7

1 = lowest risk · methodology & sources

Geopolitical Risk, by dimension

Geopolitical conflict2
Supplier concentration4
Climate & physical risk4
Sanctions exposure1
Policy continuity & property rights3

1 = lowest risk · methodology & sources

Attractiveness, by dimension

Labour cost competitiveness9
Supply base depth3
Logistics & infrastructure3
Workforce skills3
Scalability5
Ease of doing business3
Trade access & tariffs3
Sustainability baseline3
Innovation & IP1
Quality standards2

9 = most attractive · methodology & sources

Analyst scores, last reviewed June 2026; each dimension's sources and cadence are on its methodology page.

Data layers

Sierra Leone and the EU

EU imports from

€237m

0.0% of extra-EU

EU exports to

€255m

0.0% of extra-EU

EU supplier rank

EU's #139 supplier

EU trade balance

balanced or surplus

coverage 1.07

2025 annual totals, Eurostat COMEXT. EU trade board →

Electricity & grid

National sources · carbon from Ember · estimated

Electricity costs →

Industrial

315

EUR/MWh

Consumer

233

EUR/MWh, all-in

Grid carbon

48

gCO₂e/kWh

Renewables

of generation

regulated market

Power market

Import dependence

Market model

State monopoly (EDSA)

Direct PPA

None

grid access: closed

Reserve margin

Regulator

Not independent

EWRC (Electricity and Water Regulatory Commission)

Depends on Karpowership (floating power barge) for a significant share of generation. Domestic hydro (Bumbuna 50 MW) is seasonal. CLSG WAPP line connected but import capacity limited.

Power markets: full layer →

Tracked infrastructure

0 gas plants

capacity n/a · 1 building

0 solar farms

capacity n/a · 1 building

Operating assets tracked by Global Energy Monitor (CC BY 4.0); counts are tracked facilities, not exhaustive totals. Energy overview →

Metal mining

Tagged mines

1

1 production-backed

Acid-drainage prone

0

high water-risk ore class

Main commodities

Iron

Mine-water verifiability

Blind spot

AWaQ programme still being designed

Water risk is inferred from the ore class, not site measurements. Global mines: full layer →

Demographics

UN World Population Prospects 2024 · medium variant

ASEAN demographics →

Median age

19.5

→ 26.3 by 2050

Fertility

3.7

above replacement

Working-age

58.7%

aged 15–64

Old-age dep.

5.5

→ 8.3 by 2050

Median age 1990–2050

Population 8.64M · peaks 2092

By 2050: +49% (12.9M)